- Overview
- Product Parameters
- Detailed Photos
- Product Application
- Company Profile
- Certifications
- FAQ
Basic Info.
Packaging & Delivery
Product Description
2. Upper glue pot design, available EVA and PUR, one key automatic debonding.
3. Auxiliary heating device makes the seal bond more firmly.
4. 2L air storage tank, more stable pneumatic pressure.
5. Compact structure, easy to transport.
Model | F350 |
Edge band thickness | 0.5-3mm |
Edge band width | 14-40mm |
Edge banding plate thickness | 14-25mm |
Voltage | 380V/50hz/3 phase (can customize) |
Total power | 15kw |
Air pressure | 0.6-0.8Mpa |
Tank volume | 2L |
Slotting height | 3-23mm |
External dust collector | Φ150+Φ100 |
Glue pot operating temperature | 110ºC-210ºC |
The narrowest board that can be handled | 250mm |
Dimensions | 4500*1100*1640mm |
Weight | 1330kg |
Q1: I already have an edge banding machine and I would like a trimming machine. Do you have any recommendations?
A: Yes, we have a matching trimming machine. You can choose the product that suits you according to your actual production needs. Of course, we will also ask you some questions, such as plate size, plate thickness, equipment voltage, number of workers, and so on. With so many types of products, there is always one that is suitable for you.
Q2: Can your edge banding machine use PUR adhesive?
A: PUR glue has high requirements for glue pots. We recommend using models such as F14620-3700-3350 for up glue pots, depending on your specific needs.
Q3: Are you a factory or a trader?
A: We are a 20 year source production factory with rich production experience and a total of 8000+customers. We can provide you with thoughtful and accurate after-sales service.
Q4: How should I make the payment?
A: Firstly, you will pay a 50% deposit as a prepayment, and then we will start producing the equipment. After the equipment is completed, I will send you photos and videos, and you can make the remaining payment. After receiving all the payment, we will arrange for the fastest container to ship to you. You will receive the equipment soon, and I will arrange professional technicians to coordinate with you regarding installation issues.
Q5: How long is the delivery time?
A: Conventional equipment takes 10-12 days, customized voltage or other parameters take around 30-45 days.